  "projectId": "meta-talavera",
  "reviewedAt": "2026-10-17T03:08:58.377713+00:00",
  "sources": [
    {
      "issuer": "City of Talavera de la Reina",
      "url": "https://talavera.es/noticias/la-junta-de-gobierno-local-toma-conocimiento-de-la-aprobacion-inicial-del-psi-del-data-center-campus-de-meta/",
      "publicationDate": "2023-04-05",
      "eventDate": "2023-04-05",
      "reviewed": "2026-10-16",
      "kind": "Original municipal planning-process notice",
      "text": "The city records initial PSI approval and public consultation for Meta’s campus. This historical planning step is not a current construction or operating certificate.",
      "claimScope": "The city records initial PSI approval and public consultation for Meta’s campus. This historical planning step is not a current construction or operating certificate.",
      "locator": "Initial approval, March 28 resolution and public-information paragraphs",
      "accessible": true
    },
    {
      "issuer": "DatacenterDynamics",
      "url": "https://www.datacenterdynamics.com/es/noticias/publicada-la-declaracion-de-impacto-ambiental-del-data-center-de-meta-en-talavera-de-la-reina/",
      "publicationDate": "2024-03-25",
      "eventDate": "2024-03-25",
      "reviewed": "2026-10-16",
      "kind": "Independent specialist reporting on environmental planning",
      "text": "DCD reports publication of the environmental assessment, a EUR750 million project estimate and EUR685 million construction component. These are historical planning estimates.",
      "claimScope": "DCD reports publication of the environmental assessment, a EUR750 million project estimate and EUR685 million construction component. These are historical planning estimates.",
      "locator": "Environmental-resolution account and cost-scope paragraphs; linked direct PDF unavailable at check",
      "accessible": true
    },
    {
      "issuer": "DatacenterDynamics / Cristina Cueto",
      "url": "https://www.datacenterdynamics.com/es/noticias/castilla-la-mancha-acelera-la-implantaci%C3%B3n-del-campus-de-centros-de-datos-de-meta-en-talavera/",
      "publicationDate": "2026-07-30",
      "eventDate": "2026-07-30",
      "reviewed": "2026-10-16",
      "kind": "Independent specialist planning reporting and analysis",
      "text": "DCD describes continued institutional support and remaining administrative procedures for the Talavera campus. It does not document commissioned compute.",
      "claimScope": "DCD describes continued institutional support and remaining administrative procedures for the Talavera campus. It does not document commissioned compute.",
      "locator": "Support and pending-administration sections",
      "accessible": true
    },
    {
      "issuer": "Europa Press",
      "url": "https://www.europapress.es/castilla-lamancha/noticia-empresa-promotora-meta-constituye-garantia-urbanistica-vinculada-proyecto-talavera-reina-20260905104227.html",
      "publicationDate": "2026-09-05",
      "eventDate": "2026-09-05",
      "reviewed": "2026-10-16",
      "kind": "Independent publisher relaying a regional-government statement",
      "text": "Europa Press attributes to the regional government a September 2 guarantee by Zarza Networks S.L., identified as Meta’s subsidiary, following an August 7 reparcelation decision. The direct 2026 government files were unavailable.",
      "claimScope": "Europa Press attributes to the regional government a September 2 guarantee by Zarza Networks S.L., identified as Meta’s subsidiary, following an August 7 reparcelation decision. The direct 2026 government files were unavailable.",
      "locator": "September 2 guarantee, August 7 resolution and pending land-registration certificate paragraphs",
      "accessible": true
    }
  ],
  "sourceIndependence": "Documents are counted as documents, not independent confirmations. Same-issuer releases and their rewrites share an underlying claim. Four accessible documents: original municipal planning notice, two DCD reports concerning different periods, and Europa Press’s government-attributed September report. They are not four independent confirmations. Direct original company announcement and latest regional files were unavailable; later legal claims remain attributed and a final legal review remains open.",
  "limitations": [
    "Four accessible documents: original municipal planning notice, two DCD reports concerning different periods, and Europa Press’s government-attributed September report. They are not four independent confirmations. Direct original company announcement and latest regional files were unavailable; later legal claims remain attributed and a final legal review remains open.",
    "No independently measured current operating IT load, utilisation, paid project expenditure or attributable site earnings established."
  ],
  "duplicateCheck": {
    "existingIdMatches": [],
    "aliasesChecked": [
      "Torrehierro Fase 2",
      "Zarza Networks S.L.",
      "Meta Data Center Campus"
    ],
    "result": "No matching campus in serving 192-record inventory or queued new-project items; checked before integration",
    "scope": "Campus/location/legal aliases; Finnish three-site region is not separately counted as a parent project"
  },
  "wholeProjectRecertified": false,
  "aggregationEligible": false,
  "checkedRoleIds": [
    "checked-meta-talavera-META"
  ],
  "checkedMeasurementIds": [
    "checked-meta-talavera-historic-planning-investment"
  ]
}