Beyond.pl’s Poznań AI Factory Has an Operating Record
Published October 17, 2026 · Evidence-based analysis
Beyond.pl declared its F.I.N. supercomputer in Poznań fully operational on September 3, 2025. The NVIDIA-based system, housed in the company’s existing Data Center 2, has since appeared in two TOP500 rankings, giving the AI Factory a public performance record alongside its wider campus plans.
The benchmark measures computing performance. The much larger power figures promoted with the project describe the surrounding campus and its development plans, rather than the AI system itself.
A first phase with a measurable record
Beyond.pl launched the AI Factory initiative in May 2025 to offer GPU rental and AI services for training and inference. The disclosed system combines NVIDIA DGX B200 machines, Quantum-2 InfiniBand networking and FlashBlade storage supplied under the Pure Storage name. That supplier is now called Everpure.
TOP500 records F.I.N. at 7.57 petaflops of measured Linpack performance, with a 9.36 petaflop theoretical peak. It ranked 235th in June 2026, following its first listing at 211th in November 2025. These are benchmark results; the record leaves power consumption blank and does not establish customer utilization.
An established host, with a traceable site history
The AI Factory sits within Beyond.pl’s existing DC2 facility in eastern Poznań. Company location information uses Adama Kręglewskiego 11, while the current TIA constructed-facility certification lists 11A.
Poznań’s municipal records connect those addresses to the Research Centre parcels named in Beyond.pl’s earlier construction permissions. A September 2014 register records building approval, and a 2021 environmental-proceeding entry bridges the old site description to the current addresses. Those records establish the host’s identity and development history. The later AI installation is documented by the operator and benchmark record.
The larger numbers need their own milestones
Beyond.pl’s launch materials described up to 100 MW of committed campus power and a 150 MW campus target. They do not disclose how much operating IT load belongs to F.I.N. No verified installed GPU total or phase-specific power measurement was found in the reviewed documents.
Puls Biznesu reported a first-phase investment above PLN 100 million in May 2025, based on an interview in which management described a nine-digit amount. The precise final spend remains undisclosed. Kulczyk Investments’ current portfolio lists a 100% holding in Beyond.pl; the suppliers’ financial statements do not allocate revenue to this project.
For the next stage, the useful evidence will be concrete: additional installed GPUs, energized power assigned to the AI system, and disclosed spending and customer use. The existing machine gives Poznań a delivered AI-computing asset; its eventual commercial scale still has to be demonstrated.
Poznań AI Factory project profile · FJI evidence and supplier roles · Delivery checkpoints · NVIDIA company research · Poland project directory
Sources and claim verification · 14 documents
Project-specific Poznań government records establish the physical host; operator disclosures establish the AI installation; TOP500 supplies a separate benchmark record. DCD is an independent publisher reporting the company announcement, while Puls Biznesu contributes original interview-based investment reporting. Ownership and certification have separate official sources. Corporate filings are context and are not counted as project-specific government evidence. Decision dates are distinguished from undated register publication and later database-import timestamps.
- City of Poznań · Undated; reviewed October 17, 2026
Decision 1871 permits Beyond.pl’s Information Technology Research Centre on the historic Dziadoszańska site.
September 2014 register, PDF page 7, row 70; decision1871; application17698; Żegrze sheet28 parcels6/1,6/2,4/31 and sheet27 parcels1/10,1/77. Visually inspected rendered page. · Reviewed 2026-10-17
- City of Poznań · Undated; reviewed October 17, 2026
Decision 957 names Beyond.pl and the Information Technology Research Centre at Dziadoszańska10.
May 2013 register, PDF page12, row116; application10236 submitted24 April 2013. Visually inspected rendered page. · Reviewed 2026-10-17
- City of Poznań · Undated; reviewed October 17, 2026
Record82012 connects Beyond.pl at Kręglewskiego11 and11A with the Research Centre’s Żegrze sheet28 parcels6/1,6/2,4/31.
FormB, fields1–6; KOS-V.6220.86.2021; parcel map beneath the record. Saved HTML and municipal parcel data preserved. · Reviewed 2026-10-17
- Beyond.pl · 2025-05-05
AI Factory launch identifies NVIDIA DGX SuperPOD with B200 GPUs and Pure Storage FlashBlade//S500. It describes up to 100 MW of committed campus power and a150 MW campus target.
English release, launch paragraph and technical/platform and campus paragraphs. · Reviewed 2026-10-17
- Beyond.pl · 2025-09-03
Beyond.pl says F.I.N. is fully operational at its Poznań campus, using DGX B200, Quantum-2 InfiniBand and Pure Storage FlashBlade.
Release title, dated header, first three paragraphs and technical-team/commissioning paragraphs. · Reviewed 2026-10-17
- Beyond.pl · 2025-07-01
The CEO explicitly places the AI Factory in Data Center2 and describes GPU rental and AI-platform services.
Paragraphs beginning “Warto podkreślić” and “Data Center2 zapewnia”; retrieved lines128–129; service paragraphs103–106. · Reviewed 2026-10-17
- TOP500 · 2026-06
F.I.N. is listed at Beyond.pl with installation year2025, B200 GPUs, Linpack Rmax7.57 PFlop/s and theoretical Rpeak9.36 PFlop/s; June 2026 rank235, November 2025 rank211.
System180431; performance fields and TOP500 appearance history. · Reviewed 2026-10-17
- Data Center Dynamics · 2025-09-04
Charlotte Trueman reports F.I.N.’s commissioning and the disclosed NVIDIA/Pure Storage hardware at the Poznań campus.
Article body, first six paragraphs. · Reviewed 2026-10-17
- Puls Biznesu · 2025-05-05
May reporting estimated first-phase investment above PLN100 million; the CEO described a nine-digit amount without disclosing an exact budget.
Grzegorz Suteniec, “Kulczyk inwestuje miliony w fabrykę AI”, published15:08; lead and expenditure discussion. · Reviewed 2026-10-17
- Kulczyk Investments · Undated; reviewed October 17, 2026
Current portfolio lists Beyond.pl with a100% shareholding.
Beyond.pl portfolio entry, “Block of shares:100%”; corporate footer names Kulczyk InvestmentsSA. · Reviewed 2026-10-17
- Beyond.pl · Undated; reviewed October 17, 2026
Beyond.pl identifies Data Center2 at Adama Kręglewskiego11,61-248Poznań. Its map resolves to the Beyond.pl AI Factory/Data CenterCampus entity.
DC2 address and embedded Google Maps entity, CID2999241878138608268. · Reviewed 2026-10-17
- Beyond.pl · Undated; reviewed October 17, 2026
Dedicated Data Center2 page identifies the Poznań facility and AI Factory service scope.
Facility address, AI Factory section and technical specification. · Reviewed 2026-10-17
- Telecommunications Industry Association · 2026-02-23
Current register lists Beyond.pl Data Center2 at Kręglewskiego11A as ANSI/TIA-942-C Constructed Facility Rated4, certificateTIA942PL260223001, expiring22 February 2029.
Facility listing, address and active certification fields; issuer-hosted certificate text also read. · Reviewed 2026-10-17
- Everpure · 2026-02-23
Pure Storage announced its change of name to Everpure on February 23, 2026. Project commissioning disclosures retain the historical Pure Storage name.
Announcement title and dated header; rebrand section. · Reviewed 2026-10-17
Based on public records and original published reporting. No original interviews, site visits or independent engineering verification.