Expanded investment research / The Dalles, Wasco County, Oregon

Google The Dalles: an established campus still needs productive computing

FJI source-qualified: four-document gate met, including project-specific government evidence. Qualification evidence and decisions →

Project status: Existing Google campus; current capacity and workload mix undisclosed. Capacity scope: Current comparable IT capacity not established in reviewed profile. How we verify evidence.

← Back to project index

Compare this project → · Track milestones → · How to read the evidence labels

Research snapshot
Location
The Dalles, Wasco County, Oregon
Readiness
Operating
Status
Existing Google campus; current capacity and workload mix undisclosed
Confirmed companies
Google / Alphabet
Next milestone
Incremental capacity, water and power requirements, and useful computing output
Reviewed
October 6, 2026

Expanded analysis · Original disclosures linked below · CAD and USD preserved as labeled · Company statements attributed; interpretations labeled.

The one-minute investment takeaway

Our analysis: The Dalles adds a mature owner-user campus to the atlas. Google’s long local operating history reduces uncertainty about the site’s existence, but it does not establish today’s AI workload, current capacity or site return. The investor test is whether incremental computing improves product economics after energy, cooling and hardware replacement costs.

Readiness basis: Classification of evidence in the reviewed profile; strongest documented phase, not full-campus completion. Existing Google campus; current capacity and workload mix undisclosed Readiness source →

What the sources establish

Who receives the money?

Our analysis of disclosed roles. Revenue routes are business-model interpretations, not estimates of booked project revenue.

Company / exposureEconomic roleWhat investors need to establish
Google / AlphabetOwns computing infrastructure to support products and servicesIncremental product contribution and avoided computing costs after operating and replacement spending.
Power and water providersPotential recurring utility servicesNamed service contracts, allocated capacity and tariffs before attributing supplier earnings.
Construction and hardware suppliersPotential expansion and refresh ordersDocumented procurement; no specific GPU, cooling or electrical vendor is inferred.

How financially meaningful is it? Analyst interpretation

Our analysis: the corporate return comes through the services using the campus, rather than rent collected from an independent hyperscale tenant. Distinguish a facility expansion from a hardware refresh: both consume cash, but their useful lives and productive output differ. An established site can reuse common infrastructure, yet denser equipment may require power and cooling upgrades that eliminate some apparent savings. A long operating history is valuable evidence of execution, not a guarantee of an attractive return on the next dollar invested. Alphabet’s aggregate growth cannot be assigned to this campus without an attribution method.

How to test the economicsHypothetical model · not reported results

Incremental computing benefit = additional product contribution plus avoided external computing expense minus power, water, staffing, network costs, maintenance and hardware replacement. Evaluate each expansion or refresh against its own capital commitment.

Hypothetical illustration: 10 MW of steady IT load at a 1.2 PUE consumes 105,120 MWh annually at the facility level. A USD 10/MWh electricity price change alters annual cost by USD 1.0512 million. Neither the load, PUE nor tariff is disclosed for The Dalles.

Milestones that would change the assessment

MilestoneEvidence to watch
Scope of new spendingA dated phase announcement separating facility construction, hardware replacement and statewide investment.
Resource readinessUsable electricity and water capacity, permit conditions and customer-equipment acceptance.
Computing productivityEvidence of more useful work per dollar and per kWh, with realistic hardware replacement assumptions.

What could break the investment case?

Our analysis: Cooling and water requirements can change with density and operating conditions. An older building may need substantial modifications before accepting new hardware. Statewide investment and economic-impact estimates can make scale appear financially precise while leaving site returns unknown. Equipment may become obsolete faster than the buildings housing it.

What would change our view?

Our analysis: Disciplined phase spending, resource readiness and improved workload economics would strengthen the case. Rising retrofit costs, idle computing equipment or spending that outpaces monetizable usage would weaken it. We would upgrade AI attribution only with workload-specific evidence rather than assume all Google capacity is AI.

What remains unknown Not established in this review

Current IT and facility MW, occupancy-equivalent utilization, workload mix, new-phase budget, hardware orders, tariffs, measured efficiency and campus-attributable revenue or operating savings remain unestablished by the location page. Map coordinates represent the campus area, not a specific server hall.

Project research for information, not a buy recommendation. Financial illustrations use assumptions, not disclosed site results or management guidance.

Company investor information & quarterly statements

Alphabet

Project / facility operator identified in project-specific source; ownership economics and tenant contracts not certified

Official investor & shareholder information · Quarterly financial statements: 2026 Q2, quarter ended June 30, 2026

Corporate disclosures provide company-wide context. They do not establish this project’s revenue, spending, profit, ownership share or operating capacity. Disclosure verification records →

Scoped FJI evidence check · October 16, 2026

Target: Fourth-building construction began 2015; newer expansion completion dates not established in reviewed operator location page.

Dated evidence: Existing Google campus; current capacity and workload mix undisclosed

Still open: Current IT and facility MW, occupancy-equivalent utilization, workload mix, new-phase budget, hardware orders, tariffs, measured efficiency and campus-attributable revenue or operating savings remain unestablished by the location page. Map coordinates represent the campus area, not a specific server hall.

Sources: datacenters.google · OPB

Field-level review; original whole-profile dates and readiness classification retained. FJ Intelligence record →

Company research: documented roles

Follow the company profile for financial context. The evidence supports the specific role described here.

Role evidence does not establish project revenue, ownership economics, accepted capacity or a percentage of company sales.